Difference between revisions of "Randomized Control Trials"
Line 32: | Line 32: | ||
https://economics.mit.edu/files/2785 | https://economics.mit.edu/files/2785 | ||
https://www.povertyactionlab.org/research-resources/introduction-evaluations | |||
http://runningres.com/ | http://runningres.com/ | ||
http://egap.org/list-methods-guides | http://egap.org/list-methods-guides |
Revision as of 19:48, 6 November 2017
Randomized Control Trials (RCTs) are considered the 'gold standard' for impact evaluation.
The topic of randomized controlled trials is covered in many papers, handbook, and textbooks. Links to several of these are provided below (in the "external links" section).
Individual-level RCTs
Individual-level RCTs are impact evaluation design where the outcomes are measured on an individual basis. Randomization for individual-level RCTs are also done on an individual (per participant) level.
Clustered RCTs
Clustered RCTs are a type of RCT in which randomization and outcome measurement are done on the basis of a group i.e. cohort, villages, etc. This is the preferred type of RCT when the intervention is by definition applied at the cluster, rather than the individual level (for example an intervention that is targeted towards schools or health facilities in a given setting, rather than the students or patients who might attend these schools or clinics).
A key consideration in the design and analysis of cluster RCTs is that statistical power in cluster RCTs is typically lower than that for individually randomized trials. However cluster RCTs can enable measurement of spillover effects.
Randomized Phase-In
Roll-out of the intervention is randomized. This is typically done at the cluster-level. For example, an intervention is intended to treat 100 villages. 50 villages are randomly selected to receive interventions in year 1, and 50 villages are selected to receive interventions in year 2 (and therefore serve as a control group in year 1). A primary advantage of the randomized phase-in is that it is easily applied to project implementation schedules (as roll-outs typically happen over multiple years). A primary disadvantage is that once the intervention is fully rolled-out, there is no remaining control group, and thus no way to measure long-run effects.
Back to Parent
This article is part of the topic Impact Evaluation Design
Additional Resources
Wiki Links
External links
http://www.worldbank.org/en/programs/sief-trust-fund/publication/impact-evaluation-in-practice
https://economics.mit.edu/files/2785
https://www.povertyactionlab.org/research-resources/introduction-evaluations