Difference between revisions of "Cost-effectiveness Analysis"
Mrijanrimal (talk | contribs) |
Mrijanrimal (talk | contribs) |
||
Line 2: | Line 2: | ||
== Read First == | == Read First == | ||
*Cost-effectiveness analysis should be included in project design to compare alternative projects. | |||
== Guidelines == | == Guidelines == |
Revision as of 21:38, 21 February 2017
Cost-effectiveness Analysis is the economic analysis of the costs and benefits of an impact evaluation project.
Read First
- Cost-effectiveness analysis should be included in project design to compare alternative projects.
Guidelines
Subsection 1
Subsection 2
Subsection 3
Back to Parent
This article is part of the topic Cost-effectiveness Analysis